Notice to Mariners No 66 of 2026 (Temp)
Friday 11 September 2026
HARBORS AND NAVIGATION ACT 1993
Notice to Mariners No. 66 of 2026 (Temp)
SOUTH AUSTRALIA – ST VINCENT GULF – NORTH HAVEN AND HENLEY BEACH - DREDGING AND SAND DEPOSITING OPERATIONS
Mariners are advised that a Backhoe dredge will be operating south of North Haven Marina Southern breakwater and a Cutter Suction dredge West of Henley beach and West Beach
Dredging operations are scheduled for 7 days a week 24 hours a day, commencing on the 11 September. Works are scheduled to be completed mid-October 2026.
The dredging operation at North Haven is within the following area:
- 34° 47' 43" S, 138° 28' 39" E
- 34° 47' 45" S,138° 28' 58" E
- 34° 48' 18" S, 138° 29' 09" E
- 34° 48' 18" S, 138° 28' 54" E
The placement and rehandling operations at Henley and West Beach are conducted within the following approximate area:
- 34° 55' 21" S, 138° 29' 19" E
- 34° 55' 19" S, 138° 29' 37" E
- 34° 56' 50" S, 138° 30' 05" E
- 34° 56' 53" S, 138° 29' 54" E
It is recommended mariners stay 500m clear of the dredging and barges at the above locations.
Crews aboard the dredge will maintain a listening watch on VHF channel 10 and 14.
The pipeline trailing from the cutter suction dredge normally rests on the seabed; however, at certain times to facilitate dredge movements, the pipeline may be floated; a SECURITE warning will be issued on VHF channel 16.
Mariners are advised to exercise caution when navigating in this area.
Charts affected:
Paper: Aus 781, Aus 130, Aus 485, AUS4709, AUS 4060
ENC: AU5ADL01, AU435138, AU240130, AU160120
Gordon Panton
Manager Marine Safety and Compliance
Department for Infrastructure and Transport
11 September 2026
DIT 2017/02277/01